CurtPalme.com Home Theater sales, calibration, service, and discussion forum. Hundreds of free manuals & setup tips.
   


 
Sign up and receive the latest newsletters by email!     Join the Forum discussions!    
    Site Map  
Home Products
For Sale
Referral
List
Photo
Gallery
Links Contact
Us
CRT Primer
Troubleshooting Tips
Mounting Methods
Definitive CRT
Projector Setup Guide
Tube/Raster Setup
Tube Condition (Wear)
Projector
Specifications
Projector Rankings
Video Processors
Ampro 1500/2000
Ampro 2300/2600
Ampro 3600/4600
Barco (Older Analog)
Barco 70x/Cine7  
Barco 500/800/801
Barco 808/Cine8
Barco 120x/Cine9
Dwin 500/700
Electrohome ECP 
Electrohome Marquee 
Mitsubishi
NEC PG
NEC XG
Panasonic 108x
Runco
Seleco
Sony 10xx
Sony 125x/127x
Sony 1292
Sony D50
Sony G70
Sony G90
Zenith 841/851
Zenith 895/900
Zenith 1200

Sony G90 C-Element Change

 (Page 3)

Back to Advanced Procedures Index

Page: 1 2 3 4 5
 

 



8. Gently remove the green tube and LC housing from the projector and place the assembly face down on a flat bench:



9. Remove the glycol tank screw:



10. Using a 50ml syringe, remove glycol from the tank 50ml at a time (250ml total):

Tilt the LC housing assembly between each 50ml retrieval to let the air bubbles move from the tank to the tube area. Do the glycol retrieval process 5 times.
 

11. Store the retrieved glycol in a CLEAN & DRY glass container. Close it at each step to avoid getting any dust into the glycol!


... Previous Page

Next Page ...


 

© Copyright CurtPalme.com. All Rights Reserved.