6. Unscrew the top tube rotation screw and chassis ground lead:
7. Slide the bottom rotation tube axis up and to the right as follows:
8. Carefully slide-out the complete assembly with one hand on the LC housing and
the other on the tube neck end. Ensure that you do not stress any
wires/connectors during this operation:
9. Leave the tube on a smooth surface facing down as follows:
10. Unscrew all DY/Sub-DY/MG and 2P/4P coils assemblies screws around the
tube neck and place them in the same order/orientation on the floor (don’t
forget to carefully remove the plastic wedge located between Sub-DY and MG
coils):
|